Rehabilitation and upgrading of desert highway (ROAD 15 )
The work comprises the rehabilitation and improvement of contract 2 from Dabit Hanoot (station 225+500) to (station 234+000) including pavement, road furniture and safety and all other related works as indicated
The Rehabilitation and construction of pavement layers including construction of road aggregate sub base and base course, bituminous concrete binder and wearing course, tack and prime coats .
all earthworks necessary to the completion of the work, including embankment, roadway excavation including removal and disposal of unsuitable material and dirt within existing median existing asphalt pavement, speed bumps, ditches, subgrade preparation, backfilling, filling and compaction, watering, rolling, sheathing, subgrade and slope finish.
The construction of Traffic detour as shown on the drawings and directed by the Engineer
Installation and Furnishing Highway signs, Post assemblies and overhead gantry structures, including construction of all necessary concrete and reinforced concrete foundations and including all sign panel lettering,